Holcim Concrete Australia is one of the largest integrated suppliers and manufacturers of building materials and solutions in Australia & New Zealand.
The system was very problematic and becoming too expensive to maintain.
Replacement of an existing Swisslog multi-station Pneumatic Tube system (5 legs). The Swisslog system was un-reliable and not 100% fit for purpose. The system due to station configuration was unable to return carriers to the office when a driver forgot to send the docket back to the Batching Office. The system was very problematic and becoming too expensive to maintain.
ALS listened to the client and applied best practices to develop a PT System that is not only easy to operate but has no moving parts or real smarts to the system. We reutilised existing tube routes and added to them to install a Point to Point system from the Batching Plant to the Slump Stand.
We have redesigned the control/motor assemblies to fit within an IP66 electrical box. This serves multiple purposes. Secures the main componentry within a safe weatherproof lockable cabinet. Allows the assembly to be built and tested in the Workshop prior to attending the site (saves approx. 5 hours of onsite install costs) not to mention looks smart.
Made the process of Drivers receiving and sending the dockets to the batching plant simplified and more reliable. If the system is offline it becomes a safety and productivity issue with drivers walking across the plant in front of other concrete trucks.
2 Installers 4 full days.
Holcim Footscray, Melbourne, Victoria, Australia. Holcim Victoria’s main 24 hours concrete Plant.
24-hour operation of the plant.
Because ALS consult with clients and ensure what we install is not only cost-effective but relevant to their intended use. Our reputation for our after-install care and preparedness to do what is required to deliver the project in a professional manner. On this install, the technicians volunteered to work a Sunday on a long weekend as this was when the plant had a quiet period (only 2 trucks operating) to ensure minimal disruption to Holcim’s business. The boys are top-shelf.
Replacement of the existing multi-station system
Holcim Concrete Australia
June 29, 2021